Design Alley Get a transparent estimate

Lead magnet · Free download

The 51-point quality check every home passes

This is the exact checklist our team runs before we hand over your keys. Use it for your own project — whoever builds it. Save it as a PDF or print it and tick each box on site.

Get a transparent estimate

01–10 Modular & carpentry

  • Carcass made from the specified BWP/BWR-grade board
  • Shutters aligned with even gaps (within 2 mm tolerance)
  • Edge-banding sealed on all exposed edges, no lifting
  • Drawers run smooth, full-extension where specified
  • Internal accessories (cutlery, tall units) fitted per design
  • Loft and tall units plumb and level
  • Skirting and fillers flush to wall, no gaps
  • Laminate/acrylic finish free of scratches and bubbles
  • Countertop joints sealed, overhang as specified
  • Wardrobe shutters open and close without rubbing

11–17 Hardware & soft-close

  • Hinges from the specified brand, correct crank
  • Soft-close action on all doors and drawers
  • Channels rated for drawer load, no sag
  • Handles/profiles aligned at a consistent height
  • Locks and latches operate smoothly
  • Gas lifts on overhead units hold their position
  • Hardware screws tight, none missing

18–25 Electrical

  • All switches and sockets functional
  • Points located per the approved electrical layout
  • Earthing verified at sockets
  • MCB/DB labelled and load-tested
  • No exposed or loose wiring
  • Switchboards flush and level
  • Appliance points (hob, chimney, oven, geyser) correctly rated
  • Concealed conduit routes match the drawing

26–31 Plumbing

  • No leaks at any joint under pressure
  • Hot and cold lines correct at each outlet
  • Drain slopes correct, water clears fully
  • Sink, faucet and accessories fixed firm
  • Concealed cistern and fittings operate
  • Water shut-off valves accessible

32–38 Painting & finishes

  • Walls evenly coated in the specified sheen
  • No roller marks, drips or patchiness
  • Clean cut-lines at ceiling and trims
  • Putty smooth, no visible undulations
  • Texture/feature walls match the approved sample
  • Fittings and surfaces free of paint splatter
  • Touch-ups completed after installation

39–43 False ceiling & lighting

  • False ceiling level, no sag or visible joints
  • Cove and profile lighting even, no dark spots
  • Light fixtures aligned and centred per layout
  • Dimmers/scenes operate as specified
  • AC grilles and vents finished flush

44–47 Flooring & tiling

  • Tiles level with consistent grout lines
  • No hollow tiles (tap-tested)
  • Skirting tiles aligned to the floor
  • Floor protected and cleaned at handover

48–51 Final handover & safety

  • All surfaces deep-cleaned, debris removed
  • Snag list closed and re-verified
  • Warranty documents and care guide handed over
  • Client walkthrough sign-off completed

Backed for 10 years

Every Design Alley home passes all 51 checks before handover — and is covered by a minimum 10-year warranty on workmanship. Manufacturing in our own Jeedimetla factory is what lets us stand behind every point on this list.

Want this run on your home?

Get a free, transparent estimate and a VR walkthrough — and a build that passes all 51 checks, delivered in 45 days.

Get a transparent estimate